top of page

Mechanical systems are essential for providing a safe, clean, and comfortable indoor environment for building occupants. Creating ideal indoor environments while minimizing operating costs is our approach to every project .

CONSTRUCTION ADMINISTRATION

Construction Worker

Installed as Designed

Involvement during every stage of the design and construction process ensures that systems are installed as designed. By identifying installation issues as they occur, schedules are more likely to be maintained.

Blueprint Design

HVAC | Plumbing | Fire Suppression

ENGINEERING FOR THE INDOOR ENVIRONMENT

ENERGY / ECONOMIC ANALYSES

Urban Architecture Model

Helping Clients Make Informed Decisions

Life cycle cost analyses provide valuable information to aide Owners/Clients making informed decisions. By balancing first cost with corresponding operational cost, system selection can be optimized over the equipment's life cycle. Engineering that makes cents...

FACILITY MASTER PLANNING

Building Plan

Creating a Blueprint for the Future

Mechanical equipment is often times replaced on a "like for like" basis as it fails. By evaluating existing equipment condition and operating costs, a Facility Master Plan can be generated. The FMP provides the Owner with recommendations for replacement as equipment life nears it's end. Owner's are then able realize savings that would otherwise be considered "sunk costs".

JMC PE LLC Letterhead_Adjusted.PNG
CONTACT M.E.

Metairie, LA, USA

504.494.2818

Your details were sent successfully!

Home: Contact

504.494.2818

***CURRENTLY LICENSED IN LA, MS, & TX***

Metairie, LA, USA

©2016 by J/\/\C. Proudly created with Wix.com

bottom of page